Muskoka Lumber Community Centre
Image
Muskoka Lumber Community Centre
Location
Bracebridge, ON
Project Size
128,000 sq. ft.
Year Completed
2024

Rooted in community. Built for the future.

Rooted in community. Built for the future.

The Muskoka Lumber Community Centre in Bracebridge is a purpose-built recreational hub designed to bring people together year-round. This “Made in Muskoka” facility combines sport, culture, and community programming under one roof, creating a flexible venue that reflects the needs of a growing region.

A place to gather and play.

The 128,000 square foot facility includes an NHL-sized ice surface with seating for 1,000 spectators, with provisions for a future second rink. Beyond the arena, the building features a multi-purpose fieldhouse, a 350-person community hall, a public library, and an outdoor play area.

Each space has been designed to accommodate a wide range of activities, from competitive sport to community events, creating a central destination for residents and visitors alike.

Rooted in community. Built for the future.

Rooted in community. Built for the future.

The Muskoka Lumber Community Centre in Bracebridge is a purpose-built recreational hub designed to bring people together year-round. This “Made in Muskoka” facility combines sport, culture, and community programming under one roof, creating a flexible venue that reflects the needs of a growing region.

A place to gather and play.

The 128,000 square foot facility includes an NHL-sized ice surface with seating for 1,000 spectators, with provisions for a future second rink. Beyond the arena, the building features a multi-purpose fieldhouse, a 350-person community hall, a public library, and an outdoor play area.

Each space has been designed to accommodate a wide range of activities, from competitive sport to community events, creating a central destination for residents and visitors alike.

Image
Muskoka Lumber Community Centre

Efficiency in every system.

A high-performance mechanical and electrical design supports the building’s long-term sustainability goals. Variable volume air handling systems with air-side heat recovery, along with variable speed pumping, help reduce overall energy use. High-efficiency condensing boilers operate at greater than 90 percent efficiency.

The arena refrigeration system uses CO2 as a natural refrigerant, paired with heat recovery that supports spectator seating areas and domestic water pre-heating.

Designed to perform sustainably.

LED lighting throughout the facility is integrated with a networked control system that adjusts based on occupancy, daylight, and scheduling. Low-flow plumbing fixtures reduce water consumption, while provisions for future solar photovoltaic systems and electric vehicle charging support ongoing decarbonization efforts.
Integrated delivery.

Smith + Andersen provided mechanical, electrical, communications, audiovisual, security, and sustainability consulting services. Delivered using a design-bid-build approach and fully coordinated in BIM, the project brings together performance, efficiency, and community impact in a single, cohesive facility.

Image
Muskoka Lumber Community Centre
Images courtesy of Scott Norsworthy Photography

Project Team

Associate
Associate