This project bar allows selection by category or subcategory. Picking category, subcategory or keyword will filter projects immediately.

The project bar requires JavaScript, though direct links are also provided.

You may skip the project bar.

You might also like LEED, Audiovisual, Lighting
Project Map Pin

Palliser South

Description:

Designed by Gibbs Gage Architects
Photo by Gibbs Gage Architects

Located in downtown Calgary, this development features a first class 18-storey office tower and a two-storey professional services building. The office tower features a +30 connection to Tower Centre and One Palliser Square.

S + A Services Included:

Mechanical

Mechanically, both buildings tie into the Palliser central mechanical plant for chilled water. Hot water is generated via steam to water heat exchangers and the central plant steam heating system.

In the office tower, typical floors are served by chilled water compartment units located in the core with hot water radiant panels at the perimeter. A central make-up air unit located in the penthouse provides outdoor air to the compartment units on each floor. Outdoor air is preheated during shoulder seasons using chilled water return from the compartment units. A tenant condenser water system is provided for 24/7 cooling loads.

The professional building is served by two chilled water air handling units with hot water radiant panels at the perimeter.

Highlights:

Calgary, Alberta

Gross Floor Area

  • 338,500 sq ft

Total Construction Cost

$ 92,000,000

Completion Year

2009