This project bar allows selection by category or subcategory. Picking category, subcategory or keyword will filter projects immediately.

The project bar requires JavaScript, though direct links are also provided.

You may skip the project bar.

You might also like Telecommunications
Project Map Pin

Rogers Centre Videoboard Control Room

Description:

Designed by Modo Creative

This fast-tracked project involved the removal and replacement of the building's control centre. As the work had to be completed during the Toronto Blue Jays' off-season, the timeline was accelerated. Smith + Andersen ensured that code was met within this small, unique space.

S + A Services Included:

Electrical

A normal power supply has been added to the space to cover common loads. An uninterruptible power supply (UPS) provides for all critical loads to help protect equipment. Two-level lighting is now available, with track lighting utilized whenever the control room is in broadcast mode to minimize light spillage into the stadium. Standard high-efficiency 2'x2' fluorescent lighting is available for maintenance and office use during non-event programming. A complex cable management system accommodates large amounts of communication cabling feeding multiple racks and controls boards throughout the space. A full grounding system ensures that no electronic feedback on audiovisual equipment occurs.

Highlights:

Toronto, Ontario

Gross Floor Area

  • 3,000 sq ft

Total Construction Cost

$ 3,000,000

Completion Year

2012